Installation Guide; Site Requirements; Installation Preparations - Huawei PDU8000 User Manual

Modular precision pdc
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 Modular Precision PDC V2.0
User Manual

5.1 Site Requirements

The PDC site requirements are as follows:

5.2 Installation Preparations

Before installation, unpack and check the product, make available all required
technical documents, tools, and materials, check the installation environment, and
train onsite installation personnel.
Issue 04 (2021-04-13)
Far away from dust, smoke, harmful gas, and corrosive, flammable, or
explosive objects.
Free of interference from strong electromagnetic fields.
Cabling space should be planned for the site, and cable ladders and cable
trays should be designed for the PDC installation position.
The error of the installation platform levelness must be less than 10 mm.
Meets the PDC input rating requirements (see the Schematic Diagram
delivered with the product for details).
Temperature: -5°C to +40°C
Relative humidity: 5%-95% RH, non-condensing
Altitude: < 2000 m (derated when the altitude exceeds 2000 m). For the
derating details, contact Huawei technical support.
NO TE
Huawei will not be liable for any consequences caused if the installation environment does
not meet the requirements.
Copyright © Huawei Technologies Co., Ltd.
5

Installation Guide

5 Installation Guide
33

Advertisement

Table of Contents
loading

Table of Contents