Huawei USG6000 Series Hardware Manual page 207

Unified security gateway
Hide thumbs Also See for USG6000 Series:
Table of Contents

Advertisement

HUAWEI USG6000 Unified Security Gateway
Hardware Guide
Procedure
Turn on the switch of the power supply device and then the switch on the power module of
the USG. The USG starts.
You can identify the USG status based on indicators on the front and rear panels. Indicators
shown in
Figure 2-31 Indicators when the
USG6330/6350/6360/6370/6380/6390/6530/6550/6570/6620/6630 runs normally
Issue 03 (2015-01-26)
The power switch in the equipment room is easy to locate so that you can power off
devices in the case of accidents.
Power on the USG.
Figure 2-31
indicate that the USG runs normally.
Power off the USG.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Hardware Installation
197

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents