Instruments Required For The Installation - Huawei USG6000 Series Hardware Manual

Unified security gateway
Hide thumbs Also See for USG6000 Series:
Table of Contents

Advertisement

HUAWEI USG6000 Unified Security Gateway
Hardware Guide
Table 2-1
Table 2-1 Installation environment checklist
Check Item
Ventilation and heat
dissipation
Stability
Grounding
Temperature
Relative humidity
Cleanness
Electrostatic discharging
Surge protection
Power supply facility
Electromagnetic shielding

2.1.3 Instruments Required for the Installation

This section describes the instruments and meters for installing the USG.
Table 2-2
Table 2-2 Required instruments and meters
Category
Measuring and
lineation instruments
Fastening tools
Drilling tools
Issue 03 (2015-01-26)
lists installation environment check items.
Requirement
Complies with requirements
in
Complies with requirements
in
Temperature, and
Cleanness.
Complies with requirements
in
Complies with requirements
in
Protection and
Complies with requirements
in
Complies with requirements
in
Protection.
lists the required instruments and meters for USG installation.
Instrument/Meter
Ruler: used to measure length.
Marker: used to indicate specific lengths with drawn lines.
Flat-head screwdriver: used to fasten small screws and bolts.
Phillips screwdriver: used to fasten small screws and bolts.
Hammer drill: used to drill mounting holes during
wall-mounting.
Vacuum cleaner: used to remove dust and debris produced
while drilling holes.
Hammer: used to drive the hollow wall anchors into mounting
holes.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
A.3.1 Device
Position.
A.3.2 Humidity,
A.3.3 ESD
Requirements.
A.3.4 Lightning
Grounding.
A.3.5 Power
Supply.
A.3.6 Electromagnetic
2 Hardware Installation
Compliance
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
160