Siemens SINAMICS S120 Equipment Manual page 407

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Installation
To reinstall, perform the above steps in reverse order.
Note
Connecting fiber-optic cables
The fiber-optic cable plugs must be re-inserted at their original slot. Fiber-optic cables and
sockets are accordingly labeled for correct assignment (U11, U21, U31).
Note
Connection clip to the interference-suppression capacitor
The connection clip to the interference-suppression capacitor is mounted on the spare power
block together with a yellow warning label.
Please note the information in Chapter "Electrical connection" of the corresponding device.
AC Drive
Manual, 06/2019, 6SL3097-5AL00-0BP1
12.3 Service and maintenance for Chassis format components
Service and maintenance
405

Advertisement

Table of Contents
loading

Table of Contents