FusionModule2000 Smart Modular Data Cente
Maintenance Guide
Figure 6-34 Disconnecting cables from the CIM
Step 2 Remove the CIM.
Figure 6-35 Removing a CIM (from a battery cabinet)
Figure 6-36 Removing a CIM (from a battery rack)
Step 3 Clamp the new CIM to the fastener.
Step 4 Reconnect cables to the CIM based on the cable labels.
Step 5 Synchronize the parameters of the CIM on the ECC800 WebUI.
Step 6 On the WebUI of the ECC800, choose Monitoring > System > ECC800 > Controls >
Delete device with communication failure, and click Submit.
Issue 03 (2019-12-04)
Copyright © Huawei Technologies Co., Ltd.
6 Parts Replacement
68