Huawei FusionModule2000 V500R002C03 Maintenance Manual page 26

Smart modular data center
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Cente
Maintenance Guide
Table 4-7 Quarterly maintenance for the management system
Item
Operation
Battery
Check that the
management
battery
parameter setting
management
parameters in UPS
LCD are set based
on site
requirements.
Fire control
Simulate a smoky
linkage function
environment under
a smoke detector
or multi-functional
sensor. (If real
smoke is not
allowed, press the
TEST button on
the sensor.)
Check the
Check whether the
connection of the
iBAT (BIM) is
iBAT (BIM).
attached firmly
and whether all
cables are securely
connected.
Check the
Check whether the
connection of
iBOX (CIM) is
iBOX (CIM).
attached firmly
and all cables
securely
connected.
Check the
Observe the PWR,
indicator on the
RUN, and ALM
smart ETH
indicators.
gateway.
Issue 03 (2019-12-04)
Standard
Parameters are set
based on site
requirements.
A smoke alarm is
displayed on the
active alarm page of
the WebUI.
The skylight is
opened.
The alarm beacon
produces audible
and visual alarms.
The iBAT (BIM) is
attached firmly.
All iBAT (BIM)
cables are securely
connected.
No iBAT (BIM)
cable deteriorates
and the insulation
layer does not crack.
The iBOX (CIM) is
attached firmly.
The cable to the PoE
port is connected
securely.
If a cable connects
to the COM port,
check that the cable
connection is secure.
If a cable connects
to the BCB port,
check that the cable
connection is secure.
The cable to the
HALL current
monitoring port is
connected securely.
If the green PWR
indicator is steady
on, the power input
is normal.
Copyright © Huawei Technologies Co., Ltd.
4 Routine Maintenance
Troubleshooting
Set parameters correctly.
Check whether the smoke detector or
multi-functional sensor is faulty.
Check whether the skylight system is
normal.
If the alarm beacon produces audible
and visual alarms, check whether the
alarm beacon is faulty and whether the
cable connection is proper.
Secure the iBAT (BIM) again.
Check that all iBAT (BIM) cables are
securely connected.
Replace the faulty cable.
Secure the iBOX (CIM) again.
Reconnect the cable to the PoE port.
Reconnect the cable to the COM port.
Reconnect the cable to the BCB port.
Reconnect the cable to the HALL
current monitoring port.
If the PWR indicator is off, check
whether the 48 V power cable and
connectors are normal. If not,
reconnect them. If so, replace them.
20