Bay level control terminal
Table of Contents

Advertisement

1MRK 580 167-XEN
Page
5 - 32
SYN1
U
SYN1
AUTOOK
f
SYN1
MANOK
ϕ
SYN2
U
SYN2
AUTOOK
f
SYN2
MANOK
ϕ
Synchronism and energizing
check for double circuit breakers
and voltage selection
In terminals intended for one bay the U-line voltage reference phase is
selected on the man-machine interface (MMI). The reference voltage can
be single-phase L1, L2, L3 or phase-phase L1-L2, L2-L3, L3-L1. The U-
bus voltage must then be connected to the same phase or phases as are
chosen on the MMI. Fig. 2 shows the voltage connection.
In terminals intended for several bays, all voltage inputs are single phase
circuits. The voltage can be selected for single phase or phase-to-phase
measurement on the MMI. All voltage inputs must be connected to the
same phase or phases.
The circuit breaker can be closed when the conditions for FreqDiff,
PhaseDiff, and UDiff are fulfilled with the UHigh condition.
MMI
Setting
L1,L2,L3
L12,L23
L31
AD
MMI
Setting
L1,L2,L3
L12,L23
L31
Fig. 2
Connection of the synchro-check function for one bay
ABB Network Partner AB
UL1
UL2
U-Line
UL3
UN
U
U-Bus 1
UN
U
U-Bus 2
UN
Version 1.0-00
(X80167-2)