Replacing The Sample Pump Tubing - GE Sievers 900 Series Operation And Maintenance Manual

On-line total organic carbon analyzers
Table of Contents

Advertisement

11. Tighten the brass nut finger-tight. While tightening the nut, make sure it stays level with
the heat shrink tubing (Figure 32). Do not use a wrench.
12. Connect the power connector to the power supply by aligning the slot on the connector
with the slot on the power supply. Tighten the connector screw. Gently pull on the power
connector to make sure it is securely attached to the power supply.
13.
14. Record the installation date for the lamp in the service log (see Table 18 on page 193).
15. If you need to replace other consumables, follow the procedures listed in the appropriate
sections of this chapter. Otherwise, close and latch the Analyzer door.
16. Plug in the main power cord and turn the Analyzer on with the main power switch.
17. Enter the installation date for the UV lamp by following the procedures in "Setting the
Installation or Expiration Date for New Consumables" on page 190.
18. After changing the UV lamp, perform a calibration verification (see "Performing a
Calibration Verification" on page 149).

Replacing the Sample Pump Tubing

The tubing for the sample pump loses elasticity over time and must be replaced annually to ensure
proper flow rates. The tubing must be purchased from GE Analytical Instruments; use of tubing from
other sources or failure to replace the tubing on the prescribed replacement schedule will affect
Analyzer functionality.
Installation of the pump tubing requires access to the inside of the
Analyzer. To avoid potentially dangerous shock, disconnect the power
cord before opening the Analyzer's front panel.
GE Analytical Instruments ©2009
Warning
179 of 236
DLM 90488-01 Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents