Performing A Calibration Verification; Figure 25 Tc Values Summary Screen In A Multi-Point Calibration; Figure 26 Ic Values Summary Screen In A Multi-Point Calibration - GE Sievers 900 Series Operation And Maintenance Manual

On-line total organic carbon analyzers
Table of Contents

Advertisement

Calibrate
Figure 25: TC Values Summary Screen in a Multi-Point Calibration
Calibrate
Figure 26: IC Values Summary Screen in a Multi-Point Calibration

Performing a Calibration Verification

Use the verification procedure to confirm that the Analyzer's current calibration is accurate. GE
Analytical Instruments recommends performing a verification after replacement of consumables,
such as the pump tubing, UV lamp, resin bed, or reagents, and after calibration.
GE Analytical Instruments ©2009
TC Calibration
Expected
Measured
Blank
N.A.
459ppb
1ppm
1.25ppm
1.23ppm
5ppm
5.3ppm
5.33ppm
10ppm
10.2ppm
10.3ppm
25ppm
25.2ppm
25.3ppm
50ppm
50.2ppm
49.9ppm
2
R
Calibration passed
Cancel
IC Data
IC Calibration
Expected
Measured Diff
1ppm
1.52ppm
1.50ppm
5ppm
5.70ppm
5.75ppm
10ppm
10.6ppm
10.8ppm
25ppm
25.5ppm
25.4ppm
50ppm
50.4ppm
50.2ppm
2
R
Calibration passed
Cancel
TC Data
12 Apr 2004 08:12
Diff
Adjusted
N.A
462ppb
-1.60%
1.24ppm
0.57%
5.36ppm
0.98%
10.4ppm
0.40%
25.4ppm
-0.60%
50.1ppm
1.00
Print
12 Apr 2004 08:12
Adjusted
-1.32%
1.51ppm
0.88%
5.79ppm
1.89%
10.8ppm
-0.39%
25.5ppm
-0.40%
50.3ppm
1.00
Print
Apply
149 of 236
DLM 90488-01 Rev. A