Mitsubishi Electric FR-A820-00046 Instruction Manual page 268

Fr-a800 series
Hide thumbs Also See for FR-A820-00046:
Table of Contents

Advertisement

Control method
I/O signal operation during the test operation
During the test operation, the following signals are invalid:
● Input terminal function selection (Pr. 178 to Pr. 189)
– Brake opening completion signal (BRI)
– Load pattern selection forward/reverse rotation boost (X17)
– V/F switchover (X18)
– Orientation command (X22)
– Control mode switchover (MC)
– Start-time tuning start external input (X28)
– Torque bias selection 1, Torque bias selection 2 (X42, X43)
– Second brake sequence open completion (BRI2)
– Torque limit selection (X93)
● Output terminal function selection (Pr. 190 to Pr. 196)
– Electronic thermal O/L relay pre-alarm (THP)
– Brake opening request (BOF)
– Second brake opening request (BOF2)
– Orientation complete (ORA)
– Orientation fault (ORM)
– Regenerative status output (Y32)
– In-position (Y36)
– Travel completed (MEND)
– Start time tuning completion (Y39)
– Home position return failure (ZA)
– Position detection level (FP)
– During position command operation (PBSY)
– Home position return completed (ZP)
Parameters referred to
Pr. 178 to Pr. 189
Pr. 190 to Pr. 196
5 - 66
(input terminal function selection)
(output terminal function selection)
Parameters
=>
page 5-439
=>
page 5-378

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents