Operation Procedure - Toshiba TOSVERT VF-AS3 Instruction Manual

Industrial inverter (for 3-phase motors)
Hide thumbs Also See for TOSVERT VF-AS3:
Table of Contents

Advertisement

1. 5
The basic procedure to operate a motor with the inverter is as follows.
1
Check of packed items
Check of installation site
Carrying-in to installation site
9
Removal of front cover
Selection between sink logic/
Installation of insert type options
1. Read first

Operation procedure

Installation
source logic
(If necessary)
Wiring
Reference
-> [1.1 Check product purchase]
-> [2.1.1 Installation environment]
-> [2.1.2 How to install]
Removal of top cover -> [2.2 How to remove covers of inverter]
-> [2.2 How to remove covers of inverter]
-> [2.3.5 Control terminals]
->[10. 4 Selection of built-in options]
Power terminal block -> [2.3.2 Standard connection method,
2.3.3 Power terminal]
Mounting of DC reactor -> [2.3.8 Mounting of DC reactor]
Control terminal block -> [2.3.2 Standard connection method],
[2.3.5 Control terminal]
Connection of communication cables -> [2.3.6 RS485 RS485
communication connectors], [2.3.7 Ethernet connectors]
Other wiring work in the inverter
- Wiring of built-in options -> [10. 4 Selection of built-in options]
- Connection change of cooling fan power supply (when a DC
power supply is used) -> [10. 5 Using DC power supply]
Connection of peripheral devices -> [Chapter 10]
1-14
E6582062