Cisco GoQAM Installation And Operation Manual page 89

Modulator rf output and if output hardware
Table of Contents

Advertisement

6
Enter the required configuration information into the blank fields on the Basic
Parameters tab in the Set Up IF GoQAM window, then go to step 9.
7
From the QAM List, highlight a GoQAM in the list, select File > Open. The Set
Up IF GoQAM window opens with the Basic Parameters tab to the forefront
displaying the Basic Parameters configuration fields.
8
Enter or change the desired information in the Basic Parameters fields, then go to
step 9.
Notes:
See the Basic Parameters field descriptions, earlier in this section, for
descriptions of each field.
Refer to the Digital Network Control System Online Help for your system
release for more details about required DNCS procedures.
4004834 Rev D
Provision an IF GoQAM on the DNCS
73

Advertisement

Table of Contents
loading

Table of Contents