Cisco GoQAM Installation And Operation Manual page 33

Modulator rf output and if output hardware
Table of Contents

Advertisement

Stage
8
9
10
11
12
13
14
15
4004834 Rev D
Process
Define the MPEG sources and
provision the GoQAM using DNCS
Element Provisioning according to
your network wiring diagram.
Power on the GoQAM
Ensure that the GoQAM boots
correctly and check for alarms from the
front panel.
Connect the RF or IF output ports.
Set the power output level in
accordance with your network wiring
diagram and spectrum analyzer
measurements.
If sessions have been defined for the
GoQAM path, verify the correct
session count by pressing the
OPTIONS button.
If encrypted, check the program count.
Verify video and audio from a local
DHCT.
Installation Process Summary
See Procedure
Provision the RF GoQAM (on
page 37)
Provision the IF GoQAM (on page
53)
Digital Network Control System
Online Help
N/A
Understand the Boot Process (on
page 78)
Troubleshooting Alarm Messages
(on page 134)
Troubleshooting Boot Screen Error
Messages (on page 143)
Connect the RF OUT or IF OUT Ports
(on page 33)
Adjust the RF Output Level of a
Selected Carrier (on page 87)
Adjust the IF Output Level of a
Selected Carrier (on page 110)
RF: Viewing the Session Count (on
page 91)
IF: Viewing the Session Count (on
page 114)
RF: Viewing the Program Count
(on page 91)
IF: Viewing the Program Count (on
page 114)
See the post-upgrade procedures for
your current System Release contained
in the upgrade installation
instructions.
17

Advertisement

Table of Contents
loading

Table of Contents