Front Panel - Cisco SCE 1000 Installation And Configuration Manual

Hide thumbs Also See for SCE 1000:
Table of Contents

Advertisement

Front Panel

Front Panel
The SCE 1000 Front Panel consists of ports and LEDs as shown in the following figures and
tables.
Figure 2-1: SCE 1000 Front Panel
Table 2-2
Port
Mng1/
Mng2
Console
AUX
GBE ports 1 &
2
Cisco SCE 1000 2xGBE Installation and Configuration Guide
2-2
SCE 1000 Ports
Quantity
Description
2
10/100/1000 Ethernet RJ-45 ports for
management of the SCE 1000.
CLI designation: interface Management
0/1, 0/2.
1
RS-232 RJ-45 port for use by technicians A local terminal (console)
1
RS-232 RJ-45 port used by technicians
2
GigabitEthernet SC ports for connecting
to the link.
CLI designation: interface
GigabitEthernet 0/1 and 0/2
Chapter 2
Introduction to the SCE Platform
Connect This Port To...
A LAN using an FE cable
with an RJ-45 connector.
If both interfaces are used to
provide a redundant
management interface,
connect both ports to the LAN
via a switch.
using an RS-232 cable with
an RJ-45 connector, as
provided in the SCE 1000 kit.
Refer to
Connecting the Line
Ports ("Connecting the line
ports to the
network" on page
6-1) for cabling diagrams for
various topologies
OL-7821-04

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sce 1000 2xgbe

Table of Contents