AQ25A SERIES PROGRAMMABLE BOILER CONTROL PANELS
Menu Option
TEST ZONES
Tests the zone equipment individually, or sequentially, to ensure correct operation
ALL ZONES
ZONE A-1 0/1
0 / 1
...
ZONE A-16 0/1
PURGE
Purges all (or individual) zones for the period of time selected in the PURGE TIME menu option
PURGE TIME
1 to 30
(minutes)
PURGE
ALL / DHW /
ZONE A-1 ... ZONE D-16
START PURGE START PURGE /
STOP PURGE
PURGE OFF
WAIT VALVE /
PURGE COMPLETED
69-2119—02
Table 7. Installer Menu – Test and Purge. (Continued)
TEST and PURGE
Factory
Range
Default
n/a
OFF
0
5:00
(minutes)
ALL
n/a
n/a
36
Description
Sequentially energizes / de-energizes all zones connected
to the AQUATROL network.
• 0 displays when the Control Module has confirmation
that the pump/valve is closed.
• 1 displays when the Control Module has confirmation
that the pump/valve is fully open.
In the case of pump zoning, the 1 displays no more than 5
seconds after the activation of the relay. In the case of valve
zoning, the 1 displays either when the zone valve operating
time (defined in EQUIPMENT SETUP > ZONING > ZONE
VALVES TIME TO OPEN) has elapsed (AQ15540B) or
when the valve's end switch is closed (AQ15740B).
Energizes / de-energizes each zone individually.
• 0 displays when the Control Module has confirmation
that the pump/valve is closed.
• 1 displays when the Control Module has confirmation
that the pump/valve is fully open.
Duration of purge for each zone selected.
Installer selects which zones to purge (all, only DHW, or
individual zones).
Starts and Stops purge operation.