Locate and have accessible the Site Log for recording information about this installation.

Tools and Parts

Use the following list of tools and parts as a checklist for preparing for installing the SCE 2000 platform:
Appropriate cables to connect the SCE 2000 to the network and console terminal
Tape measure (optional)
Level (optional)
Number 1 Phillips screwdriver
Number 2 Phillips screwdriver
1/4-inch flat-blade screwdriver
1/4-inch hex wrench
Grounding kit (shipped with SCE 2000)
12 AWG or 2.5 mm copper installation wire with hex or loop connectors for DC power leads (DC power only)
Ring terminals must be UL approved and suitable for 12 AWG wire.
AC power cords (AC power only, shipped with SCE 2000)
Rack-mounting kit (shipped with SCE 2000)
Spare screws for changing bracket position

Prepare for Rack-Mount Installation

Before you begin the rack-mounting tasks, determine the type of rack—four-post or two-post—that you will be using.

Workbench or Tabletop Installation

Figure 1: Installing the System on a Flat Surface
For a workbench or tabletop installation, verify the following before installing the SCE 2000 platform:
The SCE 2000 platform is off the floor and has adequate ventilation.
An adequate chassis ground (earth) connection exists for the SCE 2000 platform.
The SCE 2000 platform has at least 2 inches (5 cm) of clearance at each side and at least 5 inches (12.7 cm) of
clearance at the rear to allow proper air flow.