Download Print this page

AEG ME10 Manual page 221

Power circuit breaker

Advertisement

Envelope 3 Draw out Pattern
| Baugröße 3 Ausfahrtechnik
| Taglia 3 Esecuzione estraibile
Front view 4pole
973
Centre Line
of operating panel
131.5
Top view 4pole
Centre Line
of operating
panel
A
A
58
141.5
230
Translation
Centre Line
Connected
Connection pads
DIN Rail
Disconnected
Door cut out
Draw out Front Connection
Envelope
External Power Supply
Fixed front Connection
Fixed Vertical Rear Connection
Front view
Fully withdraw
IP54 Flange drilling
Mounting brackets
Only Vertical
Operating panel
or Horizontal
Side view
Test
Time delay Module
Top view |
Remarks
A- 6 mounting holes of ø 9,5 mm
B- Clearence distance
C- Please leave unobstructed;
required for ventilation
D- 1 hole M6 Left & Right for earthing
479
Centre Line
of operating
panel
131.5
884
639.5
434.5
244.5
58
230
230
| Übersetzung
| Mittellinie
| Betriebsstellung
| Anschlussschiene
| DIN Tragschiene
| Trennstellung
| Türausschnitt
| Ausfahrtechnik Frontanschluss
| Baugröße
| Externe Stromversorgung
| Festeinbau Frontseitiger Anschluss
| Festeinbau Vertikaler Rückseitiger Anschluss
| Vorderansicht
| Voll herausgezogen
| IP54 Abdeckung Bohrplan
| Montagewinkel
| nur Vertikal
| Bedienfeld
| oder Horizontal
| Seitenansicht
| Teststellung
| Zeitverzögerungsmodul
| Draufsicht
| Hinweise
| A- 6 Montagelöcher ø 9,5 mm
| B- Sicherheitsabstände
| C- Bitte für Ventilationszwecke freilassen.
| D- 1 Loch M6 beidseitig zur Erdung
APPENDIX
Centre Line
of operating
of operating
C
A
58
141.5
| Traduzione
| Linea centrale
| Connected
| Piazzole di connessione
| Binario DIN
| Disconnected
| Ritaglio nella porta
| Connessione anteriore tipo estraibile
| Taglia
| Alimentatore esterno
| Connessione anteriore tipo fisso
| Connessione posteriore verticale tipo fisso
| Vista anteriore
| Totalmente estratto
| Sagoma di foratura flangia IP54
| Staffe montaggio
| Solo verticale
| Pannello operativo
| o orizzontale
| Vista laterale
| Verifica
| Modulo temporizzazione
| Vista dall'alto
| Osservazioni
| A- 6 fori di montaggio da ø 9,5 mm
| B- Distanza di sicurezza
| C- Non ostruire; necessario per la ventilazione
| D- 1 foro M6 Sinistra & Destra per la messa a terra
BREAKER ME10
Front view 3pole
743
364
panel
Centre
Line of
operating
panel
131.5
131.5
Top view 3pole
654
524.5
Centre Line
319.5
panel
129.5
58
230
230
6
.2
C
6.2-13

Advertisement

loading