Closing The Housing - Honeywell DL230 Operating Instructions Manual

Table of Contents

Advertisement

50
These sealing points Ill.: 14/3 to secure the pulse inputs and
pulse outputs are subject to national regulations
(cf. WELMEC 11.1, chapter 2.7.1).
Depending on the legal situation in the respective country of
use, seals produced by legally authorized manufacturers or the
meter operators, should be used.

5.3.3 Closing the housing

CAUTION!
Damage to property caused by improper device clo-
sure!
If the device is not properly closed cables can get pinched
and cause damage.
Therefore:
1. The grey covering strips on both the right and left-hand side of the cov-
er are pressed outwards at the small groove ( 2 ). This means that the
screws on the cover become visible.
2. Close the housing using the four screws provided ( 1 ).
3. Press the grey covering strips back onto the cover until they snap into
place.
Assembly, Connection and Putting into Operation
Please ensure that the cable ducts are positioned cor-
rectly when closing the device.
2
1
Ill.: 15
2

Advertisement

Table of Contents
loading

Table of Contents