Device Replacement; Replacing A Non-Redundant Or Unsynchronized Primary Plc-Cpm; Hardware Configuration Of Epm; Hardware Configuration Of Io - Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

Item LED
4, 6,
Ethernet Port
8,
Link/ Active (
10
Lower LED)

Hardware Configuration of EPM

Refer to the common

Hardware Configuration of IO

Refer to the I/O module type section.

Device Replacement

ATTENTION: If Secure Communication is enabled in the system, the relative
information of the new CPM should be updated in the IPsec configuration of the
PC installed the ControlEdge Builder and IPsec should be configured and
enabled on the new CPM. For more information, see "Chapter 9 " in the
ControlEdge PLC and ControlEdge RTU Network and Security Planning Guide.
Replacing a non-redundant or unsynchronized
primary PLC-CPM
Before replacing a non-redundant or unsynchronized primary PLC-
CPM:
n
LED
State/Color
Green
On/Off/
Blinking
EPM
ATTENTION: This procedure can only be performed while off-
process.
We recommend that you proceed with extreme caution
whenever replacing any component in a control system. Be
sure the system is offline or in a safe operating mode.
Component replacements may also require downloading
appropriate configuration data to the replaced component
through ControlEdge Builder.
Wear an ESD wrist strap and observe static precautions.
It is recommended to upload and SAVE a copy of the
configuration, or ensure that a previously saved copy of the
Description
On for connection; Off for no
connection; and blinking for activity
section.
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents