How To Use This Guide; Chapter 2 - Overview - Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

CHAPTER
2
OVERVIEW
Make sure all the hardware modules used in the system are installed
with the right firmware version and the engineering station has the
latest ControlEdge Builder. You can find the firmware and software
updates on http://www.honeywellprocess.com with valid credentials.
If the equipment is not used in a manner not specified by the
manufacturer, the protection provided by the equipment may be
impaired. 
ControlEdge 900 hardware components can be deployed in two
distinct types of control systems.
The ControlEdge Programmable Logic Controller (PLC)
n
The ControlEdge Unit Operations Controller (UOC)
n
For Control Processor Module (CPM), both the UOC and PLC use it
but with different firmware loaded.
ControlEdge PLC can be deployed standalone or with a SCADA
system including Experion PKS. Within Experion, ControlEdge PLC
can also communicate in a peer relationship to the DCS controllers
such as C300 and ContorlEdge UOC.
ControlEdge UOC is a DCS controller always deployed within
Experion PKS.
This document has been divided into three major sections.
ControlEdge PLC
n
ControlEdge UOC
n
ControlEdge 900 common reference information
n
chapters- contains details applicable to ControlEdge platform,
both PLC and UOC.

How to Use this Guide

The following table outlines the tasks involved in planning and
installing a Honeywell ControlEdge 900 Controller. The links provided
will navigate the user through those tasks.
- contains details specific to PLC.
- contains details specific to UOC.
and other
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents