Honeywell ControlEdge 900 platform Hardware Planning And Installation Manual page 211

Controledge plc, controledge rtu
Hide thumbs Also See for ControlEdge 900 platform:
Table of Contents

Advertisement

d. Connect both shield drain wires to the grounding bars at the base of the
ControlEdge 900 Controller rack. All field-wiring shields must be grounded
as described in the shield grounding section.
2. Mount the RTP to the DIN rail.
a. Secure the RTP to the rail. See "Securing the RTP to the DIN rail" on
page 228 for more information. for details.
b. Connect the cable to the RTP.Cables are marked "RTP A" and "RTP B." In
step 4, RTP A will be wired to outputs 1-16, RTP B to outputs 17-32. You
can write on the RTPs' labels to distinguish them.
3. Set/verify jumper positions on each RTP as shown.
Module Removal / Insertion Under Power (RIUP) is supported by turning off
Switch SW1 to allow removal of the module from the rack without causing an
arc.
ATTENTION: SW1 opens current loop on the ground side so that RIUP of
module is possible, but voltage is still present on the positive side at RTP
and module terminals.
See "RTP Cable wire positions, colors, and internal schematic" on page 1 for
more information.
4.
Connect field wiring.
Appendix A - Installing RTP
211