Honeywell C300 User Manual page 40

Series 8
Hide thumbs Also See for C300:
Table of Contents

Advertisement

3. C300 Controller Installation and Upgrades
3.2. C300 Controller installation
Following are the parts included:
a C300 Controller assembly (controller module with IOTA board and mounting
hardware)
STP Cat5 Redundancy Cable (Orange cable)
2 STP Cat5 Ethernet cables (one Yellow cable, one Green cable)
2 or 4 IOLink cable assemblies for connecting on-board IO Link interface if the
controller is supporting Series 8 I/O modules.
Ensure the cabinet enclosure is connected to a protective earth ground using #8 AWG
solid copper wire. There should be metal to metal contact between the grounding bus
bar and the enclosure as well as the channel.
Considerations
The secondary controller should be installed in the same cabinet as the primary
controller.
The secondary controller may be installed on a separate channel from the primary
controller.
To install a partner secondary C300 Controller, perform the following steps.
Step
1
If the primary C300 FB already exists in Control Builder and it is currently
configured as a redundant controller, select the Redundancy tab and click the
Disable Synchronization button to set the Auto-Synchronization State
parameter to "DISABLED."
2
Refer to appropriate site location drawings for the specified controller
installation location, controller Device Index (FTE address) and wiring
diagrams.
3
Identify the mounting location on channel and align mounting holes in IOTA
with screw hole locations on the channel.
38
Series 8 C300 Controller User's Guide
Honeywell
Action
R500
April 2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents