6. Load C300 Controller Configuration
6.3. Load components from Project
Considerations
All illustrations used in the procedure are for example purposes only.
To load an IOLINK block, perform the following steps.
Step
1
Click desired IOLINK block icon in
Project tab.
2
Click Tools > Load. Or, click the
load button in the toolbar.
Also, you can right click on the IOLINK
block icon to select Load.
166
Action
Series 8 C300 Controller User's Guide
Honeywell
Result
Selects and highlights the component.
The Load Dialog box appears.