Inspection Procedure - GE D30D00HCHF8AH6AM6BP8BX7A Instruction Manual

Ur series line distance protection system
Table of Contents

Advertisement

1.1 IMPORTANT PROCEDURES
1
1.
Open the relay packaging and inspect the unit for physical damage.
2.
View the rear nameplate and verify that the correct model has been ordered and delivered.
3.
Ensure that the following items are included:
• Instruction manual (if ordered)
• GE EnerVista™ CD (includes the EnerVista UR Setup software and manuals in PDF format)
• Mounting screws
For product information, instruction manual updates, and the latest software updates, visit the GE Digital Energy website at
http://www.gedigitalenergy.com.
If there is any noticeable physical damage, or any of the contents listed are missing, please contact GE Digital
Energy immediately.
NOTE
GE DIGITAL ENERGY CONTACT INFORMATION AND CALL CENTER FOR PRODUCT SUPPORT:
GE Digital Energy
650 Markland Street
Markham, Ontario
Canada L6C 0M1
TELEPHONE:
FAX:
E-MAIL:
HOME PAGE:
1-2
Figure 1–1: REAR NAMEPLATE (EXAMPLE)
Worldwide +1 905 927 7070
Europe/Middle East/Africa +34 94 485 88 54
North America toll-free 1 800 547 8629
+1 905 927 5098
Worldwide multilin.tech@ge.com
Europe multilin.tech.euro@ge.com
http://www.gedigitalenergy.com/multilin
D30 Line Distance Protection System
1 GETTING STARTED

1.1.2 INSPECTION PROCEDURE

GE Multilin

Advertisement

Table of Contents
loading

This manual is also suitable for:

D30

Table of Contents