Hitachi Relion 650 Series Technical Manual page 278

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Section 12
Monitoring
Name
PELORTOLX
AARCTMLX
APRESTRAX
AELORTMLX
AELORTCLX
AELORTOLX
ERMCORTLX
ERMCOTCLX
ERMCOTOLX
PMCORTLX
PMCORTCLX
PMCORTOLX
AMCOTMLX
AMCOTCLX
AMCOTOLX
ITMCDLLX
RCTTCLOLX
RCTTOPOLX
MCMOVTMLX
AUXSWTCLX
AUXSWTOLX
ABLSUMLX
ABLSUMRLX
LOOPPILX
SWALX
Table continues on next page
272
Type
Values (Range)
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
REAL
-
© 2021 Hitachi Energy. All rights reserved.
Unit
Description
ms
Predicted electrical opening
(interrupting) time for this phase
ms
Actual arcing time for this phase
deg
Actual pre-strike angle for this phase
ms
Actual electrical operation time for this
phase
ms
Actual electrical closing (making) time for
this phase
ms
Actual electrical opening (interrupting)
time for this phase
ms
Difference between actual and predicted
mechanical operation time for this phase
ms
Difference between actual and predicted
mechanical closing times for this phase
ms
Difference between actual and predicted
mechanical opening times for this phase
ms
Predicted mechanical operation time for
this phase
ms
Predicted mechanical closing time for
this phase
ms
Predicted mechanical opening time for
this phase
ms
Actual mechanical operation time for this
phase
ms
Actual mechanical closing time for this
phase
ms
Actual mechanical opening time for this
phase
ms
Initial mechanical movement delay in this
phase
ms
Reaction time (initial mechanical delay)
of the breaker for closing of this phase
ms
Reaction time (initial mechanical delay)
of the breaker for opening of this phase
ms
Mechanical movement time between
changeover of NO and NC auxiliary
contacts in this phase
ms
Time gap between NC and NO auxiliary
contacts changeover for closing of this
phase
ms
Time gap between NO and NC auxiliary
contacts changeover for opening of this
phase
-
Cumulated sum of calculated ablation for
this phase
-
Ablation sum in this phase relative to set
alarm level
A
Peak current interrupted during last open
operation in this phase
A
RMS current detected before last open
operation in this phase
1MRK 511 557-UEN Rev. A
Technical Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchsync pwc600

Table of Contents