Hitachi Relion 650 Series Technical Manual page 273

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 511 557-UEN Rev. A
Name
ERMCORTLX
ERMCOTCLX
ERMCOTOLX
PMCORTLX
PMCORTCLX
PMCORTOLX
AMCOTMLX
AMCOTCLX
AMCOTOLX
ITMCDLLX
RCTTCLOLX
RCTTOPOLX
MCMOVTMLX
AUXSWTCLX
AUXSWTOLX
RTKCTLX
LOOPABLLX
ABLSUMLX
ABLSUMRLX
LOOPPILX
SWALX
LOOPILX
INRUSHPLX
OPRCNTRST
INOPCNOLX
INOPCNCLX
MECHHOLX
PPREARCLX
ADAPTCLLX
ADAPTOPLX
SCATTERLX
RSTRDETLX
ALMAXRRLX
ALMAXRCLX
Table continues on next page
Technical Manual
Type
Description
REAL
Difference between actual and predicted mechanical operation
time for this phase
REAL
Difference between actual and predicted mechanical closing
times for this phase
REAL
Difference between actual and predicted mechanical opening
times for this phase
REAL
Predicted mechanical operation time for this phase
REAL
Predicted mechanical closing time for this phase
REAL
Predicted mechanical opening time for this phase
REAL
Actual mechanical operation time for this phase
REAL
Actual mechanical closing time for this phase
REAL
Actual mechanical opening time for this phase
REAL
Initial mechanical movement delay in this phase
REAL
Reaction time (initial mechanical delay) of the breaker for closing
of this phase
REAL
Reaction time (initial mechanical delay) of the breaker for opening
of this phase
REAL
Mechanical movement time between changeover of NO and NC
auxiliary contacts in this phase
REAL
Time gap between NC and NO auxiliary contacts changeover for
closing of this phase
REAL
Time gap between NO and NC auxiliary contacts changeover for
opening of this phase
REAL
Re-strike/re-ignition count for this phase
REAL
Last open operation ablation calculated for breaker contacts in
this phase
REAL
Cumulated sum of calculated ablation for this phase
REAL
Ablation sum in this phase relative to set alarm level
REAL
Peak current interrupted during last open operation in this phase
REAL
RMS current detected before last open operation in this phase
REAL
Instantaneous current interrupted during last open operation in
this phase
REAL
Inrush current peak for this phase
INTEGER
Resettable counter of CB operations in this phase
INTEGER
Total number of in-sync opening operations for this phase
INTEGER
Total number of in-sync closing operations for this phase
INTEGER
Mechanical health indication based on status of auxiliary contacts
at conclusion of CB operation
REAL
Predicted pre-arcing time for closing of this phase
REAL
Adaptive correction offset for closing of this phase
REAL
Adaptive extension of target arcing time for opening of this phase
REAL
Switching target offset for handling mechanical and electrical
scatter in this phase
BOOLEAN
Re-ignition/re-strike detected for this phase
BOOLEAN
Alarm: re-ignition/re-strike count exceeding limit for this phase
BOOLEAN
Alarm: maximum restrike correction limit reached in this phase
© 2021 Hitachi Energy. All rights reserved.
Section 12
Monitoring
267

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchsync pwc600

Table of Contents