Toro TouchNet NO-90-06 User Manual page 41

Central control system for osmac
Table of Contents

Advertisement

Special Features – 6
During the calculation process, a screen will appear stating
"Calculating Starts Please Wait". The time required to complete
the calculations is determined by the size of the watering
schedule data base. In some cases, it may require more than 30
minutes to complete this process.
Watering Schedule Diagram
The diagram in Figure 35 below is provided to help illustrate
the various event times and durations of the watering schedule
example we have used throughout the programming steps.
Figure 35 - Example watering schedule diagram.
In our example, the water window potentially starts at the
5:00 PM Update Time (when flow management calculations are
automatically performed) and ends at the 7:00 AM Day Change
time. The actual water window begins at 7:00 PM (the earliest
scheduled sequence start time) and ends at the 6:00 AM End
Time Limit. The scheduled watering sequences for Monday
begin at 7:00 PM and end at the Calculated End Time of 4:00 AM
Monday. Notice that since the Watering Day change occurs
after midnight, the watering day continues past the calendar
day change.
39
RELEASED Version
©Toro 2006-2006

Advertisement

Table of Contents
loading

Related Products for Toro TouchNet NO-90-06

This manual is also suitable for:

Touchnet tno-90-36

Table of Contents