6.
Use 2 people to load a pipe into the cam assembly
7.
Lower the pipe loading guard
8.
Lower the elevator
9.
Push the cam rotate dial
(Figure
43).
(Figure
44).
to rotate the cam assembly to the location picked in step
DOWN
Figure 42
(Figure
43).
Figure 43
14
g238263
g238264
2 (Figure
44).