10.2
Operation Timing and Processing Time of JOG
Operation
This section explains the operation timing and processing time of JOG operation.
JOG operation
JOG start signal
Positioning complete signal
*1
This is an indication of internal commands, and does not match with the actual analog output waveform.
The following values apply to t1 to t3.
t1
0.7 to 1.2ms
206
v
*1
t1
ON
OFF
(Y24, Y25)
ON
BUSY signal
OFF
(X14)
ON
OFF
(X15)
0 to 0.5ms
t2
0 to 0.5ms
t2
t3
t3
t