Mitsubishi Electric MELSEC iQ-R AnyWireASLINK User Manual page 132

Master module
Table of Contents

Advertisement

Checking the system status
■Checking CC-Link IE Field Network
After setting parameters for the master station and intelligent device station, perform the CC-Link IE Field Network diagnostics
of the engineering tool to check whether data link can normally be performed between the master station and intelligent
device station.
1.
Connect the engineering tool to the CPU module on the master station.
2.
Start the CC-Link IE Field Network diagnostics.
[Diagnostics]  [CC-Link IE Field Diagnostics]
For information on the CC-Link IE Field Network diagnostics from the master station, refer to the following.
 MELSEC iQ-R CC-Link IE Field Network User's Manual (Application)
■Checking AnyWireASLINK
Check whether the RJ51AW12AL can communicate with the slave modules normally.
The following LED statuses indicate that the communication is established normally.
• LED of the RJ51AW12AL
LED
RUN
ERR
LINK
SET
ALM
• LED of the ASLINKER
LED
LINK LED
ALM LED
Program example
This program uses the module labels of the CC-Link IE Field Network master/local module.
Write the program to the CPU module on the master station.
Classification Label name
Module label
GF11_1.bSts_DataLinkError
GF11_1.bnSts_DataLinkError_Station[1]
Label to be
Define global labels as shown below:
defined
APPX
130
Appendix 5 When Connecting the Module to a Remote Head Module
Status
On
Off
Flashing
Off
Off
Status
Flashing
Off
Description
Data link error status of own station
Data link status of each station (station No.1)
Device
SB0049
SW00B0.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r seriesMelsec iq anywireaslink rj51aw12al

Table of Contents