Installing The Gps Surge Protector; Figure 10-1 Gps Surge Protector - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900(ICR)
Installation Guide
10
This chapter describes the procedure for installing the GPS surge protector.
Context
Two types of GPS surge protector can be installed on the IFS06, as shown in

Figure 10-1 GPS surge protector

(1) GPS surge protector A
Procedure
Step 1 Remove the insert nut and toothed washer from the connector of the GPS clock signal cable, as
shown in
Issue 01 (2011-03-30)

Installing the GPS Surge Protector

NOTE
The IFS06 can be installed with one or two GPS surge protector, which should be decided according to the
actual scenario.
GPS surge protector does not need a PGND cable.
Figure
10-2.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Installing the GPS Surge Protector
(2) GPS surge protector B
Figure
10-1.
10-1

Advertisement

Table of Contents
loading

Table of Contents