Setpoint Group; Control Elements - GE Multilin F650 Instruction Manual

Hide thumbs Also See for Multilin F650:
Table of Contents

Advertisement

5 SETPOINTS

5.5CONTROL ELEMENTS

The F650 incorporates the following control elements:

setpoint Group

Underfrequency
Overfrequency
Synchrocheck (25)
Autoreclose (79)
Breaker Failure (50BF)
Broken Conductor (I2/I1)
Note: for all control elements related to the breaker, it must be considered that all operations will be performed considering
the status of the switchgear configured as breaker. In setpoint > Relay Configuration > Switchgear up to 16 switchgear
elements can be configured to operate and be monitored, but only one of them can be configured as breaker, for
monitoring, number of openings and closings counters, (KI)
The setpoints used for setpoint table management are located in Setpoint >Control Elements > setpoint Group:
Table 5–68: SETPOINT GROUP SETPOINTS
SETPOINT > CONTROL ELEMENTS > SETPOINT GROUP
SETPOINT DESCRIPTION
setpoint Grouping Permission
Active Group
Snapshot Event generation
The snapshot event setpoint enables or disables the snapshot event generation for this unit.
For more detail information go to section 5.4.1
GE Multilin
2
t.
NAME
DEFAULT
VALUE
Function
DISABLED
Active Group
GROUP 1
Snapshot Events
ENABLED
F650 Digital Bay Controller
5.5 CONTROL ELEMENTS
5.5.1 SETPOINT GROUP
STEP RANGE
N/A
[DISABLED – ENABLED]
N/A
[GROUP 1 – GROUP 2 – GROUP 3]
N/A
[DISABLED – ENABLED]
5
5-77

Advertisement

Table of Contents
loading

Table of Contents