Chapter 4: Installation

Wall Mount Installation

To mount the Analyzer on a wall, consult the required clearances for the Analyzer as shown in
Analyzer Dimension Diagrams."
Allow a minimum of 5 cm (2 in.) clearance between the back of the Analyzer and the wall for heat dissipation;
allow 30.5 cm (12 in.) of clearance on the sides, top and bottom of the Analyzer for the plumbing and electrical
connections. Additionally, this clearance provides for the proper circulation for temperature and humidity
control. When selecting the location, mount the Analyzer so that the display screen is approximately at eye-level.
Hardware for mounting the Analyzer on a wall or instrument rack is not included in the accessories kit.
Hardware should be selected based on site-specific circumstances. Mounting hardware must be able to support
four times the weight of the unit; thus, you should install mounting bolts capable of supporting 145 kg (320 lb.).

Step 4: Connect the Waste Lines

Connect the waste line, as follows:
1.
Connect one end of the waste tube to the elbow barb labeled "Waste to Drain," as shown in Figure 5.
2.
Place the other end of the tube into a free-flowing gravity drain. Avoid low spots in the tube so that
water cannot be trapped in the tube.
N
:
In the event that waste is collected in a container (not recommended), add sodium hydroxide (lye) or
OTE
sodium carbonate (soda ash) to the waste container to neutralize acid in the waste. Locate the
Analyzer in a well-ventilated area. Avoid stratification of the waste within the container by
occasionally agitating the container.
GE Analytical Instruments ©2016
Figure 5: Connecting the Waste Lines