Chapter 7: Operation with the Filter Panel
4.
Confirm that the pneumatic-signal air tube is connected to the Filter Panel and to the appropriate port
on the left side of the Analyzer, marked Air to Filter Panel. If the Filter Panel is filtering Stream 1, the
pneumatic-signal air tube should be inserted in Air to Filter Panel port 1.
5.
Confirm that compressed air is connected to the Blowback Air port on the Filter Panel.
6.
Go to the Stream (setup) screen (Setup tab > Online > Configure Online) for the stream where the Filter
Panel is installed
7.
Press the Flush/Blowback Setup button. The Flush/Blowback Setup screen appears
8.
Press the Dilution Water Flush button and then press either the On or Off button that appears.
GE Analytical Instruments ©2016
(Figure
70).
Figure 70: Stream (Setup) Screen
Figure 71: Flush/Blowback Screen
175 of 270
(Figure
71).
DLM 68100-09 EN Rev. A

Advertisement

Table of Contents
loading

Table of Contents