How To Cable The External Optical Bypass Module - Cisco SFE2000P Installation And Configuration Manual

Configuration guide
Hide thumbs Also See for SFE2000P:
Table of Contents

Advertisement

Installing the External Bypass Module
SUMMARY STEPS
1.
2.
DETAILED STEPS
Step 1
Using the screws attached to the module, screw it into an empty position in the mounting panel.
Secure the module panel to the two front posts of the rack above the SCE 2000 platform. Leave at least
Step 2
1.5 cm vertical clearance between the SCE 2000 platform and the module panel to provide space for
the cables from the front panel of the module to the rear of the SCE 2000 platform.

How to Cable the External Optical Bypass Module

The following procedure describes how to cable the External Optical Bypass module. Note the
following:
SUMMARY STEPS
1.
2.
3.
4.
5.
6.
Cisco SCE 2000 4xGBE Installation and Configuration Guide
A-4
Using the screws attached to the module, screw it into an empty position in the mounting panel.
Secure the module panel to the two front posts of the rack above the SCE 2000 platform. Leave at
least 1.5 cm vertical clearance between the SCE 2000 platform and the module panel to provide
space for the cables from the front panel of the module to the rear of the SCE 2000 platform.
All connections to the External Optical Bypass module are on the front panel of the module.
If installing only one module, the connections are as follows:
Connect the fiber (steps 3 and 4) to the GBE-1 Line ports on the SCE 2000 platform.
Connect the control cable to the Bypass 1 9-pin D-Type connector on the rear panel of the SCE
2000 platform.
If installing two modules, repeat the entire procedure for the second module, with the following
changes:
Connect the fiber (steps 3 and 4) to the GBE-2 Line/Cascade ports on the SCE 2000 platform.
Connect the control cable to the Bypass 2 9-pin D-Type connector on the rear panel of the SCE
2000 platform.
Connect an optical cable (user supplied) between the GBE port on the Subscriber side network
element and the SUB port on the External Optical Bypass module.
Connect an optical cable (user supplied) between the GBE port on the Network side network
element and the NET port on the External Optical Bypass module.
Connect the SUB cable of the fiber of the External Optical Bypass module to the SUB GBE port of
the SCE 2000 platform.
Connect the NET cable of the fiber of the External Optical Bypass module to the NET GBE port of
the SCE 2000 platform.
Power up the SCE 2000 platform, as explained in
Connect the control cable (supplied in the kit) from the Bypass 9-pin D-Type connector on the rear
panel of the SCE 2000 platform to the Control connector on the External Optical Bypass module.
Appendix A
The External Optical Bypass Module
Basic SCE 2000 Platform
Operations.
OL-7824-06

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sge2000Slm2024t-naSce 2000 4xgbe

Table of Contents