This displays the port link and auto-negotiation status.
The following example displays a system response.
EXAMPLE:
SCE 2000#show interface GigabitEthernet 0/1
Auto negotiation configured: Enabled
Actual Status:
Link is on
Autonegotiation: Enabled
Bandwidth: 100000Kbps
Burst-size: 50000bytes
Again, auto-negotiation for bump-in-the-wire topology may be enabled or disabled. For receive-only
topologies, using an external splitter, auto-negotiation must be disabled.
How to View the Gigabit Ethernet Counters
In an inline topology, you can monitor traffic via the platform counters for both the Rx and Tx
connections. The counters increase, together with the increased number of packets that flow through the
SCE 2000 for both Rx and Tx.
However, in external switch topologies, the counters for the Tx do not increment, that is, Tx does not
have a function in monitoring traffic, as it is disconnected.
Step 1
At the SCE 2000# prompt, type show interfaceGigabitEthernet 0/ interface-numbercounters.
This displays the GigabitEthernet counters. This command enables you to verify that traffic is taking
place. You can see that the counters increase, together with the increased number of packets that flow
through the SCE 2000 .
Again, in bump-in-the-wire topology, both the Rx and Tx counters apply as traffic monitors. For
receive-only topologies, using an external splitter, only the Rx counters apply.
The following example shows the counters of the first Gigabit Ethernet interface.
SCE 2000#show interface GigabitEthernet 0/1 counters
In total octets: 100
In good unicast packets: 90
In good multicast packets: 0
In good broadcast packets: 10
In packets discarded: 0
In packets with CRC/Alignment error: 0
In undersized packets: 0
In oversized packets: 0
Out total octets: 93*2^32+1022342538
Out unicast packets: 858086051
Out non unicast packets: 0
Out packets discarded: 0
What to Do Next
You are now ready to continue to the next stage,
Application.
Cisco SCE 2000 4xGBE Installation and Configuration Guide
6-10
Chapter 6
Cabling the Line Ports and Completing the Installation
How to Load and Activate a Service Control
OL-7824-06

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sge2000Slm2024t-naSce 2000 4xgbe

Table of Contents