Figure 66 - St 700 Basic Transmitter - Meter Body Reassembly; Figure 67 - St 700 Basic Transmitter - Head Bolt Tightening Sequence - Honeywell SmartLine ST 700 User Manual

Pressure transmitters
Hide thumbs Also See for SmartLine ST 700:
Table of Contents

Advertisement

Figure 66 – ST 700 Basic Transmitter - Meter Body Reassembly
16. Use a torque wrench to gradually tighten nuts to torque rating in sequence shown in Figure
Tighten head bolts in stages of 1/3 full torque, 2/3 full torque, and then full torque as per Table 39.
Figure 67 – ST 700 Basic Transmitter - Head Bolt Tightening Sequence
17. Feed the ribbon cable on the new meter body through the neck of the housing.
CAUTION: To prevent damage to the ribbon cable, use care when assembling
the meter body to the electronics housing.
18. Screw the new meter body into the housing until the bottom of the meter body adapter is
flush with the neck of the electronics housing.
19. Tighten the outside set screw to be sure it is fully seated in the slot in the header.
20. Loosen the set screw ½- turn.
Page 216
ST 700 SmartLine Pressure Transmitters User's Manual
67.
Revision 13

Advertisement

Table of Contents
loading

Table of Contents