Maintenance
To Clean Optical Connectors
4 Mate all connectors to bulkheads and proceed to
Verifying Equipment Operation, on page 46
below.
5 It is also recommended that all connectors be visually inspected after cleaning to verify the connector is
clean and undamaged.
Verifying Equipment Operation
Perform circuit turn-up. If the equipment does not come up, i.e., fails verification or indicates a reflection
problem, clean the connectors and bulkheads again.
Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide
46