Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide - Cisco GS7000 Installation And Operation Manual

Super high output intelligent node
Table of Contents

Advertisement

Installation
5 Move the housing as needed to install the coaxial cable and connectors. See the illustrations below for an
example.
Figure 2: Powered from Left
Figure 3: Powered from Right
If supplying power to the node through a main output port, a power inserter must be installed to inject the
Note
AC voltage onto the RF signal.
6 Use a torque wrench and a 1/2-inch socket to tighten the strand clamp bolts from 5 ft-lb to 8 ft-lbs (6.8 to
10.8 Nm).
A slight tilt of the face of the housing is normal. Cable tension will cause the housing to hang more closely
Note
to vertical.
7 Connect the coaxial cable to the pin connector according to the pin connector manufacturer's specifications.

Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide

Strand Mounting the Node
19

Advertisement

Table of Contents
loading

Table of Contents