Verifying The Issu State Before Beginning The Issu Process - Cisco Catalyst 4500 Series Configuration Manual

Release ios xe 3.3.0sg and ios 15.1(1)sg
Hide thumbs Also See for Catalyst 4500 Series:
Table of Contents

Advertisement

Chapter 6
Configuring the Cisco IOS XE In Service Software Upgrade Process
Current Processor Information :
------------------------------
Switch Software (cat4500e-UNIVERSALK9-M), Version 03.00.00.1.68 CISCO UNIVERSAL
DEVELOPMENT K10 IOSD TEST VERSION
Copyright (c) 1986-2010 by Cisco Systems, Inc.
Compiled Sun 29-Aug-10 03:57 by gsbuprod
Peer Processor Information :
------------------------------
Switch Software (cat4500e-UNIVERSALK9-M), Version 03.00.00.1.68 CISCO UNIVERSAL
DEVELOPMENT K10 IOSD TEST VERSION
Copyright (c) 1986-2010 by Cisco Systems, Inc.
Compiled Sun 29-Aug-10 03:57 by gsbuprod

Verifying the ISSU State Before Beginning the ISSU Process

Ensure that the active and standby supervisor engines are up and in ISSU Init state and that both
supervisor engines are running the same current image.
The following example displays the ISSU state before the process begins:
Switch# show issu state detail
The new version of the Cisco IOS XE software must be present on both of the supervisor engines. The
directory information displayed for each of the supervisor engines shows that the new version is present.
Switch# dir bootflash:
Directory of bootflash:/
OL-25340-01
Hardware Mode = Duplex
Configured Redundancy Mode = Stateful Switchover
Operating Redundancy Mode = Stateful Switchover
Maintenance Mode = Disabled
Communications = Up
Active Location = slot 5
Current Software state = ACTIVE
Uptime in current state = 9 minutes
Image Version = Cisco IOS Software, IOS-XE Software, Catalyst 4500 L3
Configuration register = 0x2920
Standby Location = slot 6
Current Software state = STANDBY HOT
Uptime in current state = 2 minutes
Image Version = Cisco IOS Software, IOS-XE Software, Catalyst 4500 L3
Configuration register = 0x2920
ISSU State = Init
Operating Mode = Stateful Switchover
Current Image = bootflash:old_image
Pre-ISSU (Original) Image = N/A
Post-ISSU (Targeted) Image = N/A
ISSU State = Init
Operating Mode = Stateful Switchover
Current Image = bootflash:old_image
Pre-ISSU (Original) Image = N/A
Post-ISSU (Targeted) Image = N/A
5
-rw-
129923402
6
-rw-
127724184
Slot = 5
RP State = Active
Slot = 6
RP State = Standby
Aug 6 2010 09:32:33 +00:00
Aug 6 2010 09:34:07 +00:00
Software Configuration Guide—Release IOS XE 3.3.0SG and IOS 15.1(1)SG
How to Perform the ISSU Process
old_image
new_image
6-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents