NEC Univerge SV9100 Hardware Manual page 147

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

UNIVERGE SV9100
System Hardware Manual
10.
Align the Small Battery Box with the grooves at the top and bottom of
the Base chassis and slide into position.
Figure 3-106 Installing Small Battery Box
11.
Push the battery lock in, then connect the battery cable.
Figure 3-107 Locking the Small Battery Box
Issue 1.2
3 - 75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents