Battery Installation - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 1.2
Figure 3-79 Installing the CHSG LARGE BATT BOX using the CHS2UG JOINT BRACKET KIT
3 - 60
3.
Align bolt holes in CHS BASE UNIT (see figure below) with holes
drilled in floor and secure using four anchor bolts.
4.
Align and install the CHS LARGE BATT BOX on top of the CHS BASE
UNIT.
5.
Secure the CHS LARGE BATT BOX to the CHS BASE UNIT using the
CHS2UG JOINT BRACKET KIT. Refer to figure below.
6.2.2

Battery Installation

1.
Loosen screw on front of CHS LARGE BATT BOX.
Figure 3-80 Removing CHSG LARGE BATT BOX Cover
2.
Swing cover outward and detach from CHS LARGE BATT BOX.
UNIVERGE SV9100
Installing the SV9100 Chassis

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents