Installing the External Batteries 19" (CHS2UG) Chassis

An optional (locally procured), external battery source can be used to provide
power during a power failure.
CHS LARGE BATT BOX (Backup time = Three Hours for 30 Terminals)
Table 3-2 CHSG LARGE BATT BOX Capacity
Configuration
SV9100
2U x 1
2U x 2
2U x 3
2U x 4
One CHSG LARGE BATT BOX can be used for 4 x 2U chassis for approximately 45
è
minutes.
6.2.1

Floor Mounting the CHS LARGE BATT BOX

Figure 3-77 Installing the Access Panel
Battery Capacity
(Number of Batteries)
21AH (=3 sets of [2x12V-7AH])
42AH (=6 sets of [2x12V-7AH])
63AH (=9 sets of [2x12V-7AH])
84AH (=12 sets of [2x12V-7AH])
UNIVERGE SV9100
Number of
CHSG LARGE
BATT BOX
1
2
3
4
Installing the SV9100 Chassis