Rack Mounting The Chassis; Rack Mounting The 19" (Chs2Ug) Chassis - NEC Univerge SV9100 Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 1.2
R
S
5
ACK
ECTION
5.1
3 - 50
6.
Turn the 9.5 inch chassis over and place in the location to be installed.
Secure the 9.5" assembly to a flat surface with the four screws supplied.
7.
To prevent possible damage to the 19" chassis due to falling, NEC
recommends screws be installed in the stand mount brackets as soon
as possible.
8.
Connect grounding wire to chassis. Refer to Chapter 4 paragraph
Installing the 9.5" Base (CHS2UG) Chassis on page 3-16
details on grounding the system.
9.
Refer to
1.1.5 Install AC Power Cords on 19" Chassis on page 3-15
installation of the power cord or, Chapter 6 paragraph
Safety Precautions on page 4-3
M
OUNTING THE

Rack Mounting the 19" (CHS2UG) Chassis

A single or multiple chassis can be rack mounted. Controlling and Expansion
chassis can be racked mounted by stacking them horizontally.
1.
The 19" chassis requires two rack mount brackets per chassis for mounting.
Each 19" chassis requires its own set of rack mount bracket(s). Refer to
Figure 3-64 Stand Mount 9.5" Chassis
for installation of blades.
C
HASSIS
UNIVERGE SV9100
1.2
for complete
2.1 Installation and
Installing the SV9100 Chassis
for

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents