D20E Ethernet I/O Module
Chapter 8: Powering-up and Testing
a D20E Module
Prerequisites
D20E ETHERNET I/O MODULE INSTRUCTION MANUAL
Powering-up and Testing a D20E Module
This chapter describes how to test for proper operation of a D20E module:
•
Prerequisites
on page 101
•
Power up procedure
on page 102
•
Test your field I/O
on page 102
Prior to testing of the D20E module, the following tasks must be complete:
1.
Earth ground has been connected; see chapter:
page 83.
2.
Field wiring has been completed; see sections:
–
D20E-A analog inputs module
–
D20E-K control outputs module
–
D20E-S digital inputs module
–
D20E-C combination inputs and outputs module
3.
Communication connections have been made; see chapter:
and Networks
on page 77.
4.
Firmware has been configured; see chapter:
37.
In addition, DAPserver Studio must be on-hand.
You are now ready to power-up the D20E module and verify that the D20E module is
functioning properly.
Preliminary Power Up and Test
on page 87,
on page 89,
on page 95, and
on page 97
Configuring the D20E Firmware
GE INFORMATION
on
Connecting to Devices
on page
101