Configuring The D20E Firmware - GE Multilin D20E Installation And Maintenance Manual

Ethernet i/o module
Table of Contents

Advertisement

Installation process
36
The tasks required to install a D20E module in a system are:
1.
Configure the firmware; see chapter:
2.
Mount the D20E module in a 19" rack or cabinet; see chapter:
Module
on page 75.
3.
Connect to devices and networks; see chapter:
on page 77.
4.
Power-up the D20E module and run the preliminary power up and test; see chapter:
Preliminary Power Up and Test
5.
Connect the field wiring; see sections:
D20E-A analog inputs module
D20E-K control outputs module
D20E-S digital inputs module
D20E-C combination inputs and outputs module
6.
Power-up the D20E module and verify that D20E module is functioning properly; see
chapter:
Powering-up and Testing a D20E Module
7.
Monitor D20E module operation; see chapter
GE INFORMATION
CHAPTER 2: INSTALLING THE D20E MODULE

Configuring the D20E Firmware

Connecting to Devices and Networks
on page 83.
on page 87
on page 89
on page 95
on page 97
on page 101.
Using the D20E Module
D20E ETHERNET I/O MODULE INSTRUCTION MANUAL
on page 37.
Mounting a D20E
on page 103

Advertisement

Table of Contents
loading

Table of Contents