Canon imageRUNNER ADVANCE C9075S PRO Operating Information Manual page 134

Color digital multifunction imaging system
Hide thumbs Also See for imageRUNNER ADVANCE C9075S PRO:
Table of Contents

Advertisement

Introduction to the 'Schedule' view
The 'Schedule' view
3
[218] The 'Schedule' view
1. The jobs pane
The jobs pane shows the jobs on a timeline. The width of the job corresponds to the
(remaining) print time. A vertical line separates the jobs. The vertical line moves to the
left as the printing of a job progresses.
An icon and the job name represent a job. The icon indicates the state of the job, for ex-
ample printing .
Furthermore, the icon indicates the stop moments of the machine. For example, when
the setting 'Confirm start of job' in the workflow profiles (see list of references below) is
set to 'On' or when you use the 'Stop after job' function.
2. The 'Required media' pane
The 'Required media' pane displays the media that are required for each scheduled job.
For each required media, the media properties are displayed (see list of references below).
The bars show the availability of the media. The bars can have the following colors.
134
Chapter 6 - Print jobs
2
4
1
5