Cloudopera Neteco Management; Logging In To The Edcm (Using A Web Client) - Huawei FusionModule500 User Manual

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual
Context
For detailed operations, see
Commissioning Guide of the corresponding version.
Procedure
1.
2.
3.

5.3.13.2 CloudOpera NetEco Management

5.3.13.2.1 Logging In to the EDCM (Using a Web Client)

Prerequisites
Procedure
Step 1 In the browser address box, enter https://
and then press Enter.
Issue 02 (2020-12-25)
You have created modules in Data Center Planning.
Choose System > Configuration > Data Center Planning from the main
menu. The Data Center Planning window is displayed.
On the Data Center Planning page, click
Click Access to access the Add Device page. You can add an ECC800-Pro
device to the specified smart module on the page.
Figure 5-56 Adding an ECC800-Pro device to the smart module
NO TE
Click OK, and you can view the task information, including Type, Device Name,
Region, Progress, Status, Start Time, End Time, and Information in the displayed
Progress window.
You have obtained a valid user name and password.
You have created a free trial order or purchased an official business package.
Copyright © Huawei Technologies Co., Ltd.
iManager NetEco 6000 Device Installation and
IP address of the NetEco server :31943,
5 Power-On Commissioning
in the upper left corner.
227

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents