Installing The Communications Cables; Webui Management; Neteco Management - Huawei TP48200A-HT19C4-1 Installation Manual

Hide thumbs Also See for TP48200A-HT19C4-1:
Table of Contents

Advertisement

TP48200A-HT19C4-1 & TBC300A-TCA2
Installation Guide

7.2 Installing the Communications Cables

7.2.1 WebUI Management

Procedure
Step 1 Connect the FE port on the SMU by using a network cable, as shown in
Figure 7-2 Connecting a communications cable (for WebUI management)
(1) FE port
----End

7.2.2 NetEco Management

Networking Mode 1: over FE Port
Step 1 Connect the FE port on the SMU by using a network cable, as shown in
Figure 7-3 Connecting a communications cable (over the FE port)
(1) FE port
----End
Networking Mode 2: over RS485 Port
Step 1 Connect one end of the network cable to the RS485/RS232 port on the SMU.
Issue 01 (2014-03-12)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Cables
Figure
7-2.
Figure
7-3.
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tbc300a-tca2

Table of Contents