Installation - Toro Workman GTX Service Manual

Hide thumbs Also See for Workman GTX:
Table of Contents

Advertisement

5. Disconnect shift cable from shift lever (Fig. 16):
A. Remove ball joint from shift lever assembly.
Then, remove ball joint from end of shift cable.
B. Remove shift cable jam nut on the left side of the
parking brake mount and pull cable from brake
mount.
6. Note routing of shift cable through front frame for as-
sembly purposes.
7. Carefully remove shift cable by pulling it through the
front frame toward front of vehicle.

Installation

1. Carefully route shift cable through the front frame
and toward the transaxle using cable routing noted dur-
ing cable removal.
2. Connect front of shift cable to shift lever (Fig. 16):
A. Insert front end of shift cable through hole in park-
ing brake mount.
B. Secure shift cable to parking brake mount with
jam nuts. Locate the jam nuts in the middle of the ca-
ble adjustment area.
C. Fully install ball joint onto end of shift cable and
secure with jam nut. Then, secure ball joint to shift
lever assembly.
3. Make sure that shift lever on steering column is in the
NEUTRAL position and that shift lever on transaxle is in
the NEUTRAL position.
4. Connect rear of shift cable to transaxle (Fig. 14):
A. Fully install ball joint (item 8) to end of shift cable
and secure to cable with jam nut.
B. Position shift cable to spanner bar (item 3) mak-
ing sure that spanner bar is between washers and
jam nuts on cable.
C. Adjust cable position with jam nuts on spanner
bar so that ball joint on end of cable can easily be in-
serted into shift lever on transaxle. Tighten jam nuts.
D. Secure ball joint to transaxle shift lever.
E. Secure shift cable to swing arm with clip.
5. Check that forward, neutral and reverse positions
engage as shift lever is moved to each position. If neces-
sary, adjust shift cable at spanner bar so that all posi-
tions engage. If necessary, additional cable adjustment
can be made with jam nuts at the parking brake mount.
Workman GTX Gasoline
6. After shift cable adjustments have been made, install
dash (see Dash in the Service and Repairs section of
Chapter 6 − Chassis).
7. Lower and secure cargo bed.
4
5
1.
Shift cable
2.
Ball joint
3.
Shift lever
1.
Shift cable
2.
Cable jam nuts
Page 4 − 17
1
2
Figure 15
4.
Spanner bar
5.
Transaxle
2
3
4
Figure 16
3.
Ball joint
4.
Parking brake mount
Drive Train
3
1

Advertisement

Table of Contents
loading

Table of Contents